ESCALATOR INSTALLATION
Install escalator in convention center.
LOAD: 22,000 lbs.
SOLUTION
Air Caster Rigging System
BENEFIT
- Two people easily turn escalator sections around tight corners
- Aero-Casters distribute load weight, meeting floor loading limitations set by convention center engineers
- Simple overlay facilitates move over rough surfaces
Solution: [ Rigging System ]
MACHINE TOOL INSTALLATION
Install EDM into precision machine shop production line.
LOAD: 14,000 lbs.
SOLUTION
Air Caster Rigging System
BENEFIT
- Protects epoxy floors
- Less manpower required to move machines
- Configurable to move a wide variety of loads
- Quiet and safe
Solution: [ Rigging System ]
HEAT EXCHANGER REPLACEMENT
Replace heat exchanger on mezzanine level in a nuclear plant. Move path is through constricted space with overhead obstacles.
LOAD: 40+ tons
SOLUTION
AeroGo Air Caster Rigging System with engineered support cradle
BENEFIT
- Significantly reduced plant downtime; moved in hours instead of days
- Significantly reduced manpower required to move the heat exchanger using traditional methods
- Air casters distribute load evenly and mitigated mezzanine floor load concerns
Solution: [ Rigging System ]
FROM OUR CUSTOMERS
“We have had good luck with Aero-Casters in the past, and they continue to be a valuable and safe alternative for moving a load. They provide a better long term cost solution.”