Aug 01, 2016
May 23, 2016 – Flexible, Compact Rigging Kits Move Loads up to 64,000 lbs.
Compact and flexible, the AeroGo Air Caster Rigging Kit contains everything necessary to move heavy, awkward or delicate loads using compressed air.
Apr 14, 2016
March 23, 2016 – Industrial Hovercraft Technology Moves Heavy Loads On and Offshore – OTC
Industrial hovercraft technology has proven effective to move loads from one to 900 tons both on and offshore.
Apr 14, 2016
March 22, 2016 – AeroGo Air-Powered Stainless Steel Pallet Awarded Silver Medal
The readers of Plant Engineering magazine have awarded the AeroGo Air-Powered Stainless Steel Pallet the Silver Medal in the Material Handling Systems category for the 2015 Product of the Year Awards.
Apr 14, 2016
February 3, 2016 – Flexible, Compact Rigging Kits Move Loads up to 64,000 lbs.
Compact and flexible, the AeroGo Air Caster Rigging Kit contains everything necessary to move heavy, awkward or delicate loads using compressed air.
Jan 11, 2017
September 1, 2015 – New Material Handling Option for Medical/Pharmaceutical Industry
AeroGo, Inc. has introduced a high capacity stainless steel pallet with a load capacity of 31,000 lbs. (14 MT).
Jan 11, 2017
December 17, 2014 – AeroGo Load Modules Support Orion Project
An AeroGo air caster system was integral to the production of the Orion crew module, slated for launch this month. NASA utilized an AeroGo system of six load modules and a control consoleembedded into the crew module support structure.
Jan 11, 2017
October 2014 – La nueva manera de hacer flotar y transportar las cargas – Revista Metal Actual
La nueva manera de hacer flotar y transportar las cargas
Jan 11, 2017
January 1, 2014 – Takuya Miyajima Promoted to Southeast Asia Regional Manager
AeroGo, Inc. announced the promotion of Takuya Miyajima to Central and Southeast Asia Regional Manager. Tak is a mechanical engineer with significant experience providing load moving solutions in all market sectors.
Jan 11, 2017
November 1, 2013 – Move Megaton Feedwater Heaters
An interactive hands-on model makes it easy to see how it is possible to move megaton components such as feedwater heaters and casks in nuclear plants in hours instead of days
Jan 11, 2017